Registered Building Practitioner · Perth WACall 0448 028 979[email protected]
Before handover · Mundijong

Practical completion inspections
Mundijong, WA.

Practical completion inspections for new homes in Mundijong, WA, where new estates are being built around an older townsite in the Shire of Serpentine Jarrahdale. The visible work is checked against the NCC and relevant Australian Standards before handover.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Mundijong, Western Australia
Direct answer

What is a handover inspection of a new home in Mundijong?

Mundijong handover inspections record visible work in new homes, including houses in Taylor Springs and other releases around the older townsite, shortly before completion. The visit uses the NCC edition on the building permit and relevant Australian Standards. A written report is provided for discussion with the builder.

Taylor Springs and the older townsite.

What will be reviewed in a Mundijong new home?

A practical completion inspection in Mundijong is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. The report records incomplete and defective items so they can be raised with the builder.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Mundijong, Western Australia
A new home near handover in a Mundijong estate.

Mundijong, postcode 6123, is in the Shire of Serpentine Jarrahdale. When you enquire, send the address, builder contact, expected handover, access notes, and any plans or previously raised items.

What a Mundijong practical completion visit typically covers

  • Site levels, drainage, retaining and fencing on new lots, including lots next to older or rural land.
  • Finished work compared with approved plans, where supplied.
  • Roof, wet areas, doors, windows and internal finishes, with photographs.
  • Open items while streets and amenities in early stages are still being finished.

Scope limits in Mundijong

The inspection is not a contractual practical completion ruling, an occupancy approval, or a certificate for work that cannot be seen. Commissioning and specialist testing are excluded unless the agreed scope includes them.

We do not provide legal advice.

Housing and construction

What new housing is coming to Mundijong?

Mundijong is in the Shire of Serpentine Jarrahdale, south of Byford. It has a longer-established townsite and is now also a growth area for new residential estates, including Taylor Springs, which has been preparing further stage releases.

ABS data analysed by OpenLot recorded 374 new houses in Mundijong in 2025–26, a large increase on the year before. Western Power reported in October 2026 that power infrastructure to unlock 1,300 lots in Mundijong was scheduled to begin in November 2026.

New homes may therefore be completed in streets that are still being formed, and some lots sit at the edge of rural land.

Sources: OpenLot, 2026 National ABS Housing Data Report; Western Power, New power projects to boost housing lots (12 October 2026); public materials for Taylor Springs, Mundijong. Postcode 6123: Australia Post. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at a Mundijong handover?

New lots next to older land

Where a new house meets a rural or older boundary, visible levels, fencing, retaining and the direction of stormwater are checked. The report records what can be seen, not a survey of boundaries.

Early infrastructure

In a new stage, crossovers, verges and drainage swales may be incomplete. Those items are listed as open if they form part of the agreed scope or affect access.

Slab, paving and soakwells

Look for ponding, settled covers and cracked or uneven paving, especially on filled ground.

Internal work and wet areas

Finishes, doors, cabinetry and visible wet-area workmanship are recorded with photographs.

Permit standards

What is a Mundijong practical completion inspection assessed against?

In Mundijong the inspection follows the NCC edition recorded on the building permit and the Australian Standards that edition references, including AS 2870 for slabs and footings and timber or steel framing standards where they can be inspected visually. It is not an AS 4349.1 pre-purchase inspection. Early-stage releases and the older townsite can sit side by side; the scope is always the new home and its lot, not public streets or parkland. Concealed construction is not certified.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Mundijong questions

Mundijong practical completion FAQs

A Mundijong quote is prepared for that property and the scope you agree. Book online, or call 0448 028 979.

Do you inspect homes in Taylor Springs and other Mundijong releases?

Yes, once the address and builder are provided. A written scope is agreed for each new Mundijong home, in Taylor Springs or elsewhere in the suburb.

Is Mundijong in the area you visit?

Yes. Mundijong is in the Shire of Serpentine Jarrahdale and is part of the south-east area we attend. Travel is confirmed for the specific address.

Power or estate works are still being finished. Should we wait?

Book when a handover date is known and the builder can give access to the house. Incomplete estate services can affect what is finished; that is recorded if it is visible from the lot.

Does the inspection decide practical completion under the contract?

No. Contractual practical completion is a matter for the contract and, where it applies, the Home Building Contracts Act 1991 (WA). The report records visible work. We do not provide legal advice.

How do I book in Mundijong?

Request a quote or book online. The inspection is not booked until the scope and fee are agreed in writing.

Mundijong & Western Australia

Tell us what you need.

Send the Mundijong address, the builder and the handover timing. We confirm scope and fee before booking. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›