Practical completion inspections
Byford, WA.
Practical completion inspections for new homes in Byford, WA, in the Shire of Serpentine Jarrahdale. The visible work is checked against the NCC and relevant Australian Standards, including on sloping or scarp-edge lots, before you accept handover.
Last updated 28 November 2026 (Australia/Perth).
- Registered Building Practitioner (WA) No. 101996
- 27 years’ industry experience, national & international
- Fully insured: Professional Indemnity and Public Liability

What does a practical completion inspection cover in Byford?
In Byford, the practical completion inspection is a written check of a new home shortly before the keys are due, in a suburb still adding streets and rail-side housing. Visible work in safely accessible areas is compared with the NCC and relevant Australian Standards. The report is sent for discussion with the builder.
What is inspected in a new Byford house?
A practical completion inspection in Byford is a focused inspection of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. On sloping lots, retaining, drainage and driveway grades are looked at closely.

Byford is in the Shire of Serpentine Jarrahdale, postcode 6122. Include the street address, builder contact, expected handover, access arrangements, and any plans or items already raised.
Byford handover inspection items
- Retaining walls, batters, drainage and driveway grades on sloping or cut-and-fill lots.
- Finished work compared with approved plans and any estate guidelines, where supplied.
- Roof, gutters, wet areas and internal finishes, with photographs.
- Open external items such as crossovers, fencing and incomplete paving.
What the Byford report does not decide
The report does not determine contractual practical completion, issue occupancy approval, or certify concealed construction. Service commissioning and specialist testing are omitted unless expressly agreed in writing.
We do not provide legal advice.
How is Byford changing as a housing area?
Byford is in the Shire of Serpentine Jarrahdale, on the south-east edge of the Perth metropolitan area, below the Darling Scarp. Satterley’s The Glades is a large master-planned community in Byford. Satterley has described Cardup Brook as a later precinct of that estate. Other estates in and next to Byford have also continued to release lots.
Western Power reported in October 2026 that underground power works were under way to unlock 950 lots in Byford. Movehomes, using REIWA data, listed 102 vacant-land sales in Byford in 2024.
Lots near the scarp or on former rural land are often cut and filled, so levels, retaining and drainage are a practical part of a handover check.
Sources: Satterley, About The Glades, Byford; Western Power, New power projects to boost housing lots (12 October 2026); Movehomes, Top 10 Perth suburbs by land sales 2024 (REIWA data). Postcode 6122: Australia Post. Information is general, was current when this page was written, and may change.
What gets checked at a Byford handover?
Sloping sites and retaining
On cut-and-fill lots, look at the condition of retaining walls, the junction between the wall and the house or paving, surface drainage, and whether ground has settled next to the slab or garage. The inspection does not re-engineer the wall or the footings.
Driveways and crossovers
Steeper sites can make driveway grades and crossover levels harder to get right. Visible cracking, ponding and the junction with the garage slab are recorded.
Compare the house with the plans
If you supply the approved plans and any design guidelines, visible differences can be noted, including outdoor areas and fencing.
Wet areas and roof plumbing
Falls to wastes, visible tiling, gutters, downpipes and flashings are checked where they can be seen safely.
How is a Byford handover inspection different from a pre-purchase check?
Byford’s clay-influenced soils and ongoing estate earthworks make visible slab behaviour, site drainage and retaining especially relevant at handover. The inspection is taken against the NCC edition on the building permit and against referenced standards such as AS 2870 and AS 3500.3 where those works can be seen. It is not a pre-purchase inspection under AS 4349.1. Unfinished streets can limit access; any such limit is noted. The report does not certify covered work or decide practical completion under the contract.
The standard your building must meet
Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.
The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).
The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.
Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.
The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.
Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.
The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.
This is a summary of legislation only and is not legal advice.
Questions about Byford practical completion inspections
Byford inspections are quoted individually for the house and the agreed scope. Book online or call 0448 028 979.
Do you inspect new homes across Byford estates?
Yes. Provide the address and the builder’s name. The written scope is agreed for each Byford home, in any current release.
Is Byford in the service area?
Yes. Byford, in the Shire of Serpentine Jarrahdale, is in the south-east area we attend. A date is confirmed for each property.
The rail works and new streets are still going. Does that affect the inspection?
The inspection is of the house and lot. Unfinished public streets may affect access, which is recorded. Public infrastructure is generally the developer’s or the Shire’s responsibility.
Can you come before I collect the keys in Byford?
Yes, subject to the builder arranging access, a free time, and a written agreement on scope. The report is issued of the visit.
How do I book a Byford inspection?
Request a quote or book online. Scope, fee and access are agreed in writing before the visit.
Tell us what you need.
Share the Byford address, builder and handover date. Scope, fee and availability are confirmed first. Call 0448 028 979.