Before handover · Cardup

Practical completion inspections
Cardup, WA.

Practical completion inspections for new homes in Cardup, WA, next to Byford in the Shire of Serpentine Jarrahdale. The visible work is checked against the NCC and relevant Australian Standards before you accept handover.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Cardup, Western Australia
Direct answer

What is a practical completion inspection in Cardup?

A practical completion inspection in Cardup is a pre-handover record of visible work on a new house, including lots near Cardup Brook and in current releases. Safely accessible areas are checked against the NCC and relevant Australian Standards. The report is so you can talk it through with the builder.

Cardup Brook and current releases.

What does the Cardup handover inspection look at?

A practical completion inspection in Cardup is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. The written report is for you to discuss with your builder before accepting the home.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Cardup, Western Australia
A new home near handover in a Cardup estate.

Cardup, postcode 6122, is in the Shire of Serpentine Jarrahdale. Please send the lot or street address, builder contact, expected handover, access arrangements, and any plans or items already noted.

Items typically checked in a Cardup new home

  • Site levels, drainage, retaining and fencing on new estate lots, including lots near Cardup Brook or rural edges.
  • Finished work compared with approved plans and any estate guidelines, where supplied.
  • Roof, wet areas, doors, windows and internal finishes, with photographs.
  • Open items while surrounding stages are still under construction.

What a Cardup inspection will not certify

The visit does not determine contractual practical completion, provide occupancy approval, or certify concealed construction. Service commissioning and specialist testing are not included unless expressly agreed.

We do not provide legal advice.

Housing and construction

What is being built in Cardup?

Cardup is in the Shire of Serpentine Jarrahdale, immediately south of Byford, and shares postcode 6122 with Byford. New housing in the locality includes later precincts of The Glades described by Satterley as the Cardup Brook precinct, and other estates such as Constellar, which has been reported as a large lot-release project in Cardup.

Because Cardup sits between the Byford urban area and rural land, new homes may be close to a watercourse reserve, remnant vegetation or a rural boundary. Those edges affect drainage, fencing and, on some lots, bushfire construction requirements.

Handover inspections here follow the same standards as in Byford, with the address and access confirmed for the particular lot.

Sources: Satterley, About The Glades (Cardup Brook precinct); public reports of Constellar estate, Cardup. Postcode 6122: Australia Post. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at a Cardup handover?

Drainage near low ground

Lots near a brook, swale or rural drain need paving and downpipes that throw water away from the house and into the designed system. Ponding and unconnected downpipes are recorded.

Retaining and edges

Cut-and-fill lots and lots next to reserves need visible retaining, batters and fencing checked for completeness and obvious defects.

Bushfire items, if they apply

Where the approved plans show BAL construction items, the visible items are compared with those plans if you supply them. The inspection does not set the BAL.

The house itself

Roof plumbing, wet areas, doors, windows and internal finishes are checked in the same way as on any new home, with photographs.

Drainage and levels

How does a Cardup inspection differ from a visual pre-purchase check?

Cardup lots can sit close to Cardup Brook and to unfinished estate levels, so visible site drainage, falls to outlets, and retaining are often relevant at handover. Those items are assessed under the NCC edition on the permit and under referenced standards such as AS 3500.3 and AS 2870, where they can be seen. The inspection is not a pre-purchase inspection under AS 4349.1. Only safely accessible areas are covered, and the report does not certify hidden work or decide contractual practical completion.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Cardup questions

Questions about inspections of new homes in Cardup

Cardup visits are priced for the individual house and agreed scope. Book online or call 0448 028 979 for a quote.

Do you inspect new homes in Cardup releases, including lots near the brook?

Yes. Send the address and the builder’s name. The written scope covers the house and lot; waterways and public reserves are not part of the house inspection.

Cardup shares a postcode with Byford. Do you still treat it as its own suburb?

Yes. Cardup is its own locality in the Shire of Serpentine Jarrahdale, postcode 6122. Give the Cardup address so the correct property is quoted.

Is Cardup in the service area?

Yes. Cardup is in the south-east area we attend. A visit date is confirmed for each property.

Can you inspect before I pick up the keys?

Yes, if the builder can arrange access, a time is available, and the scope is agreed in writing. The report is sent.

How do I book a Cardup inspection?

Request a quote or book online. Scope and fee are agreed in writing before the inspection is booked.

Cardup & Western Australia

Tell us what you need.

Provide the Cardup address, the builder and the handover date. Scope and fee are agreed before a time is set. Call 0448 028 979.

Request a quote ›