Before handover · Hilbert

Practical completion inspections
Hilbert, WA.

Practical completion inspections for new homes in Hilbert, WA, including houses in estates planned under the Wungong urban water precincts. The visible work is checked against the NCC, relevant Australian Standards and, where supplied, the approved plans.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Hilbert, Western Australia
Direct answer

What is a practical completion inspection in Hilbert?

A Hilbert practical completion inspection is a written snapshot of visible work in a new home shortly before handover, including houses in the Wungong urban area. Accessible work is reviewed against the NCC and Australian Standards referenced by the permit, such as those for drainage where they apply. The report follows.

Wungong urban area, before the keys.

What will the Hilbert handover inspection record?

A practical completion inspection in Hilbert is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. Where you supply them, the approved plans and any local development plan are also used for comparison.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Hilbert, Western Australia
A new home near handover in a Hilbert estate.

Hilbert is in the City of Armadale, postcode 6112. To prepare a quote, send the address, builder contact, planned handover, access instructions, and any plans or outstanding items.

Hilbert inspection coverage at handover

  • Visible compliance with approved plans and any local development plan or Wungong design guidelines, where supplied.
  • Drainage, paving and finished levels in an area planned around urban water management.
  • Roof, wet areas, doors, windows and internal finishes, with photographs.
  • Open items while later stages of the estate are still under construction.

What the Hilbert visit will not do

The visit is not a contractual practical completion decision, an occupancy approval, or a certificate of hidden work. Specialist testing and service commissioning are excluded unless expressly agreed.

We do not provide legal advice.

Housing and construction

How is the Wungong area in Hilbert being built?

Hilbert is in the City of Armadale, in the Wungong urban area. DevelopmentWA publishes structure plans and local development plans for precincts in Hilbert, including Precinct 20 (Tonkin South), which covers Peet’s The Avenue estate. Those local development plans sit with the Wungong Urban Water Design Guidelines and, as the plans themselves note, may later be normalised under the City of Armadale’s planning scheme.

Movehomes, using REIWA data, listed 156 vacant-land sales in Hilbert in 2024. The City of Armadale has also advertised later structure plans in Hilbert, including a proposed plan for Lot 5072 Rowley Road with an estimated yield of 89 lots, so further stages are still entering the planning system.

Because the area was planned with water management as a central issue, drainage, finished levels and the way lots sit relative to living streams or public open space are a practical part of handover.

Sources: DevelopmentWA planning documents for Wungong/Hilbert precincts, including The Avenue local development plans; City of Armadale, proposed structure plan for Lot 5072 Rowley Road, Hilbert; Movehomes (REIWA data). Postcode 6112: Australia Post. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at a Hilbert handover?

Local development plans and design guidelines

Hilbert lots often have an LDP or design guidelines that vary fencing, setbacks or garage placement. If you supply those documents, visible differences from them can be recorded. Interpreting whether a difference is a breach is a legal or planning question.

Drainage and finished levels

Look for paving falling away from the house, connected downpipes, and water sitting in yards or garages. Lots next to living streams or drainage open space need those edges to be finished as planned.

The house itself

Roof plumbing, wet areas, doors, windows and internal finishes are checked and photographed.

Unfinished stages

Later streets and parks may still be under construction. Access limitations and items outside the lot are recorded, not treated as your builder’s work unless the contract says so.

Water management and the NCC

Which standards guide a Hilbert practical completion inspection?

Hilbert sits in the Wungong urban water area, so visible stormwater design, finished levels and landscaping falls are often part of what can be seen at handover. Those observations are made under the NCC edition on the building permit and under referenced standards such as AS 3500.3 and AS 2870. The service is not an AS 4349.1 pre-purchase inspection of an existing dwelling. Only safely accessible areas are inspected. The report does not certify concealed construction or determine practical completion under the contract.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Hilbert FAQs

Questions about Hilbert handover inspections

Hilbert inspections are priced for that house and the agreed scope. Book online or call 0448 028 979 to request a quote.

Do you inspect new homes in Hilbert’s Wungong urban area?

Yes. Give the address and the builder’s name. A written scope is agreed for each Hilbert home before the visit.

Why do drainage and levels come up so often in Hilbert?

Hilbert is planned within the Wungong urban water area. Where site drainage, outlets and finished levels are visible and accessible, they are recorded against the permit and the relevant standards.

Is Hilbert in the service area?

Yes. Hilbert is in the City of Armadale and is part of the south-east area we attend. A date is confirmed for each property.

Can you attend before I collect the keys in Hilbert?

Yes, subject to builder access, availability, and a written agreement on scope. The report is of the inspection.

How do I book a Hilbert inspection?

Request a quote or book online. Scope and fee are agreed in writing before the visit.

Hilbert & Western Australia

Tell us what you need.

Tell us the Hilbert address, the builder and when handover is expected. Scope and fee are agreed first. Call 0448 028 979.

Request a quote ›