Registered Building Practitioner · Perth WACall 0448 028 979[email protected]
Before handover · Wellard

Practical completion inspections
Wellard, WA.

Practical completion inspections for new homes in Wellard, WA, including houses near Wellard Station in the City of Kwinana. The visible work is checked against the NCC and relevant Australian Standards before you accept handover.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Wellard, Western Australia
Direct answer

What is a handover inspection of a new home in Wellard?

In Wellard, the handover inspection is a written record of visible work in a new home, including attached and small-lot houses around Wellard Village, shortly before completion. Safely accessible areas are checked against the NCC and relevant Australian Standards. The report arrives for discussion with the builder.

Wellard Village and small-lot houses.

What is looked at in a Wellard new home, including attached houses?

A practical completion inspection in Wellard is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. Attached and smaller-lot homes near the station are checked for visible boundary, eaves and drainage details as well.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Wellard, Western Australia
A new home near handover near a southern Perth train station.

Wellard is in the City of Kwinana, postcode 6170. Include the street address, builder contact, expected handover, access arrangements, and any plans or items already raised with the builder.

Wellard inspection items, including attached housing

  • Attached and smaller-lot homes near the station: shared or boundary walls, eaves, gutters and service areas.
  • Finished work compared with approved plans, where supplied.
  • Roof, wet areas, doors, windows and internal finishes, with photographs.
  • Open items on the day, including incomplete external works.

Independence of the Wellard visit

The inspector does not determine contractual practical completion, grant occupancy approval, or certify construction that cannot be seen. Commissioning and specialist tests are excluded unless the written scope includes them.

We do not provide legal advice.

Housing and construction

What housing is around Wellard Village?

Wellard is in the City of Kwinana and is centred on Wellard Station on the Mandurah line. DevelopmentWA describes The Village at Wellard, developed in partnership with Peet, as expected to deliver around 3,075 homes, with blocks within walking distance of a shopping precinct and the station, and quotes a 31-minute train trip to the Perth CBD. A Peet media release dated 31 July 2025 stated that the estate had sold its final lot.

New housing has not necessarily ended with that estate. On 15 May 2026 the WA Government announced new housing opportunities next to Wellard Station, describing three government-released sites capable of up to 200 homes. Other estates in the suburb have also been planned or released in stages.

Movehomes, using REIWA data, listed 78 vacant-land sales in Wellard in 2024. Handover inspections may therefore be for homes still being finished in existing stages, or for later sites as they are built.

Wellard is a City of Kwinana suburb organised around Wellard Village, the station and a mix of detached, small-lot and attached houses. A practical completion inspection of an attached or terrace house is still a record of visible work on that dwelling and its lot; neighbouring dwellings are not inspected unless they are part of the agreed scope.

Sources: DevelopmentWA, The Village at Wellard overview; Peet Limited media release (31 July 2025); WA Government, New housing opportunities next to Wellard Train Station (15 May 2026); Movehomes (REIWA data). Postcode 6170: Australia Post. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at a Wellard handover?

Homes near the station

Smaller or attached lots need visible boundary walls, eaves, gutters and bin or service areas checked carefully. The WA appendix to the NCC Housing Provisions has variations covering fire separation of roofed outdoor areas, which can matter for alfresco areas close to a neighbour.

Compare the work with the plans

If you supply the approved drawings, visible differences can be recorded.

Drainage on compact lots

Downpipes, paving falls and any water sitting against the house or in the garage are checked.

The house itself

Roof plumbing, wet areas, doors, windows and internal finishes are inspected and photographed.

Attached and small-lot work

How is a Wellard practical completion inspection different from a pre-purchase check?

Wellard inspections often involve attached or small-lot houses, so party-wall junctions that can be seen, separating walls at the lot, balcony edges, and services on compact sites receive attention where they are safely accessible. The reference documents are the NCC edition on the building permit and referenced Australian Standards, including wet-area and lining standards that apply to the work. This is not an AS 4349.1 pre-purchase inspection. The report does not certify concealed work or decide contractual practical completion, and it does not inspect a neighbour’s dwelling unless that is agreed.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Wellard questions

Wellard practical completion FAQs

A Wellard inspection is priced for that property and the agreed scope. Book online, or call 0448 028 979 to request a quote.

Do you inspect attached and small-lot houses in Wellard Village?

Yes. Give the address and the builder’s name. The written scope is for that dwelling and its lot. A neighbour’s dwelling is not inspected unless it is expressly included.

Is Wellard in the service area?

Yes. Wellard is in the City of Kwinana and is part of the southern area we attend. A date is confirmed for each address.

Our house shares a wall. Does the scope change?

The same NCC and referenced standards apply. Visible junctions and any accessible separating details on your lot are recorded. Work inside a neighbouring dwelling is outside scope unless agreed.

Is this the right inspection for an existing Wellard house?

No. Use a pre-purchase building inspection under AS 4349.1 for an existing home.

How do I book a Wellard inspection?

Request a quote or book online. The scope and fee are agreed in writing before the inspection is booked.

Wellard & Western Australia

Tell us what you need.

Share the Wellard address, builder and handover date. Scope and fee are settled before a time is offered. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›