Practical completion inspections for new homes in Hammond Park, WA, in the City of Cockburn. The visible work is checked against the NCC and relevant Australian Standards before you accept handover.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Hammond Park, Western Australia
Direct answer

What is a practical completion inspection in Hammond Park?

A practical completion inspection in Hammond Park documents visible work in a new house at handover, including homes in Vivente, Kali and other current estates. The inspector refers to the NCC and relevant Australian Standards in safely accessible areas. A report is provided so you can discuss it with the builder.

Vivente, Kali and other current estates.

What will the Hammond Park handover inspection include?

A practical completion inspection in Hammond Park is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. The report records incomplete and defective items for discussion with your builder.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Hammond Park, Western Australia
A new home near handover in a Hammond Park estate.

Hammond Park, postcode 6164, is in the City of Cockburn. When you get in touch, send the address, builder contact, expected handover, access details, and any plans or items already raised.

What is typically reviewed in a Hammond Park new home

  • Finished work compared with approved plans and any local development plan, where supplied.
  • Boundary walls, eaves, gutters and drainage on compact lots.
  • Roof, wet areas, doors, windows and internal finishes, with photographs.
  • Open items in streets where later stages are still being finished.

What the Hammond Park visit does not include

The visit is not a contractual practical completion ruling, an occupancy approval, or a certificate of concealed building work. Service commissioning and specialist testing are left out unless they are expressly agreed.

We do not provide legal advice.

Housing and construction

What estates are still handing over in Hammond Park?

Hammond Park is in the City of Cockburn, west of the Kwinana Freeway and south of Success, and shares postcode 6164 with Treeby and Jandakot. Residential estates in the suburb have continued to release later stages. Public materials have described further stages at Vivente, and Kali Estate has been advertised with titles expected in late 2026.

Movehomes, using REIWA data, listed 119 vacant-land sales in Hammond Park in 2024. Western Power has also listed Hammond Park among areas where construction of new power infrastructure is expected to begin in 2027 under its Housing and Infrastructure Growth Program.

New homes here are often on compact lots in later stages of estates that already have nearby schools and local shops, so some streets are finished and others are not.

Hammond Park sits west of the Kwinana Freeway in the City of Cockburn, so it is a different local government area from nearby Wandi and Wellard in the City of Kwinana. Later stages at Vivente, and advertised titles at Kali Estate in late 2026, mean some handovers will be on compact lots in streets that already have neighbours, rather than on a bare first-stage pad.

Hammond Park is west of the Kwinana Freeway in the City of Cockburn, so it is a different local government area from Wandi and Wellard in the City of Kwinana. Current releases include later stages at Vivente and advertised titles at Kali. A practical completion inspection records the visible condition of the house and lot on the day, including any incomplete services that can be seen.

Sources: Movehomes (REIWA data, 2024); public materials for Vivente and Kali Estate, Hammond Park; Western Power, New power projects to boost housing lots (12 October 2026). Postcode 6164: Australia Post. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at a Hammond Park handover?

Compact lots

Boundary walls, eaves, gutters and fencing are checked for completeness and obvious defects, along with bin and service areas on smaller lots.

Drainage

Paving falls, downpipe connections and any ponding against the slab or in the garage are recorded.

Plans and guidelines

If you supply the approved plans or an LDP, visible differences can be noted.

The house itself

Roof plumbing, wet areas, doors, windows and internal finishes are inspected and photographed.

Current Cockburn estates

Which documents guide a Hammond Park practical completion inspection?

A Hammond Park practical completion inspection is measured against the NCC edition on the building permit and against referenced Australian Standards such as AS 2870 for slabs and AS 3740 for wet areas where those finishes can be seen. It is not a pre-purchase inspection under AS 4349.1. If electrical or estate services are not yet complete, that is recorded as an observed condition; the inspection does not commission those services. Concealed construction is not certified, and the report does not decide contractual practical completion.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Hammond Park questions

Hammond Park inspection questions

Hammond Park visits are quoted for the individual house and agreed scope. Book online or call 0448 028 979.

Do you inspect homes in Vivente, Kali and other Hammond Park estates?

Yes. Provide the address and the builder’s name. A written scope is agreed for each Hammond Park home, in any current release.

If power or estate services are still incomplete, should we wait?

Book when a handover date is known and the builder can give access. Incomplete services that are visible from the house or lot are recorded. The inspection does not commission those services.

Hammond Park shares 6164 with Treeby. Does that matter?

Use the Hammond Park street address so the correct suburb is quoted. They are separate City of Cockburn localities that share a postcode.

Is Hammond Park in the service area?

Yes. Hammond Park is in the City of Cockburn and is part of the southern area we visit. Availability is confirmed for each property.

How do I book a Hammond Park inspection?

Request a quote or book online. Scope and fee are agreed in writing first.

Hammond Park & Western Australia

Tell us what you need.

Send the Hammond Park address, the builder and the handover date. We agree scope and fee first. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›