Practical completion inspections
Wandi, WA.
Practical completion inspections for new homes in Wandi, WA, in the City of Kwinana along the southern freeway corridor. The visible work is checked against the NCC and relevant Australian Standards before you accept handover.
Last updated 28 November 2026 (Australia/Perth).
- Registered Building Practitioner (WA) No. 101996
- 27 years’ industry experience, national & international
- Fully insured: Professional Indemnity and Public Liability

What is a practical completion inspection in Wandi?
In Wandi, a practical completion inspection is the handover record of visible work on a new house, including homes along the Kwinana Freeway corridor. The inspector works in safely accessible areas and uses the NCC plus relevant Australian Standards. A written report is supplied for discussion with the builder.
What does the inspector look at in a new Wandi house?
A practical completion inspection in Wandi is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. The report records incomplete and defective items for discussion with your builder.

Wandi, postcode 6167, is in the City of Kwinana. To quote the visit, send the lot or street address, the builder’s contact, the planned handover, access instructions, and any plans or items already raised.
What is usually inspected in a Wandi new home
- Finished work compared with approved plans and any local development plan, where supplied.
- Drainage, paving, retaining and fencing on new estate lots.
- Roof, wet areas, doors, windows and internal finishes, with photographs.
- Open items while surrounding stages are still under construction.
Limits of the Wandi visit
The visit does not itself determine contractual practical completion, provide occupancy approval, or certify concealed construction. Service commissioning and specialist testing are omitted unless expressly agreed in writing.
We do not provide legal advice.
How is Wandi growing along the freeway corridor?
Wandi is in the City of Kwinana, on the Kwinana Freeway corridor between Success and Anketell, and shares postcode 6167 with Mandogalup. It forms part of the southern metropolitan growth area often grouped in statistics with Casuarina.
ABS data analysed by OpenLot recorded 552 new houses in the Casuarina–Wandi area in 2025–26, up from the year before. That figure covers a combined statistical area, not only the suburb of Wandi, but it shows that new homes are being completed along this corridor.
New estates here are typically staged, so a house can reach handover while neighbouring lots, verges or parks are still being finished.
Lots close to the Kwinana Freeway may have fencing, setbacks or other treatments shown on the approved plans. If you supply those plans, the inspection can record whether the visible work matches them. Items outside the lot, including the freeway reserve, are not part of the inspection.
Wandi is a City of Kwinana suburb in postcode 6167, a postcode it shares with Mandogalup, and it sits along the Kwinana Freeway between Success, Anketell and Mandogalup. Housing in the Casuarina–Wandi statistical area has continued to be added in recent ABS counts, which is why handover inspections are still requested here.
Sources: OpenLot, 2026 National ABS Housing Data Report (Casuarina–Wandi SA2); City of Kwinana local government area. Postcode 6167: Australia Post. Information is general, was current when this page was written, and may change.
What gets checked at a Wandi handover?
Plans and estate guidelines
If you supply the approved plans or a local development plan, visible differences in setbacks, garage position, fencing and outdoor areas can be recorded.
Drainage and filled lots
Look for paving falling away from the house, connected downpipes, and soakwell covers or pits that have not settled.
Unfinished surroundings
Incomplete verges, crossovers and neighbouring construction are recorded as access or open-item notes. They may sit with the developer rather than your builder.
The house itself
Roof plumbing, wet areas, doors, windows and internal finishes are checked and photographed.
What standard is a Wandi handover inspection measured against?
A Wandi practical completion inspection compares visible work with the NCC edition on the building permit and with referenced Australian Standards, including AS 2870 for slabs and footings and the AS 3500 plumbing and drainage series where those installations can be seen. It is not a pre-purchase inspection under AS 4349.1. Freeway-corridor lots can have acoustic fencing or retaining that is inspected only where it is on the lot and safely accessible. The report does not certify hidden work or decide practical completion under the contract.
The standard your building must meet
Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.
The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).
The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.
Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.
The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.
Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.
The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.
This is a summary of legislation only and is not legal advice.
Wandi practical completion questions
Wandi inspections are quoted one house at a time, according to the agreed scope. Book online or call 0448 028 979 for a quote.
Do you inspect new homes in Wandi?
Yes. Give the address and the builder’s name. A written scope is agreed for each Wandi home before the visit is booked.
Wandi shares postcode 6167 with Mandogalup. How should I enquire?
Use the Wandi street address so the correct suburb is quoted. Wandi and Mandogalup are separate City of Kwinana localities.
Is Wandi in the service area?
Yes. Wandi is in the City of Kwinana and is part of the southern area we attend. Travel is confirmed for the specific property.
Can you attend before I collect the keys in Wandi?
Yes, if the builder can provide access, a time is available, and the scope is agreed in writing. The report is sent of the visit.
How do I book a Wandi inspection?
Request a quote or book online. Scope and fee are agreed in writing first.
Tell us what you need.
Provide the Wandi address, the builder and when you expect handover. We agree scope and fee before booking. Call 0448 028 979.