Practical completion inspections
Baldivis, WA.
Practical completion inspections for new homes in Baldivis, WA, in the City of Rockingham. The visible work is checked against the NCC and relevant Australian Standards before you accept handover, including in later estate stages and future North East Baldivis precincts.
Last updated 28 November 2026 (Australia/Perth).
- Registered Building Practitioner (WA) No. 101996
- 27 years’ industry experience, national & international
- Fully insured: Professional Indemnity and Public Liability

What does a practical completion inspection cover in Baldivis?
Baldivis practical completion inspections document visible work in a new home shortly before handover, in a City of Rockingham suburb with ongoing land releases. Accessible areas are assessed against the NCC and the Australian Standards that apply to the permit. The report can be raised with the builder.
What is reviewed in a new Baldivis house at handover?
A practical completion inspection in Baldivis is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. The report records incomplete and defective items, with photographs, for discussion with your builder.

Baldivis, postcode 6171, is in the City of Rockingham. When you contact us, include the property address, builder details, expected handover, access arrangements, and any plans or items already raised.
Baldivis handover inspection coverage
- Finished work compared with approved plans and any local development plan, where supplied.
- Drainage, paving, retaining and fencing on sandy, filled and compact lots.
- Roof, wet areas, doors, windows and internal finishes, with photographs.
- Open items in streets where later stages are still under construction.
What the Baldivis inspection will not decide
The inspection does not determine contractual practical completion, issue occupancy approval, or certify concealed construction. Commissioning and specialist tests remain excluded unless they appear in the agreed scope.
We do not provide legal advice.
Where is new housing still being released in Baldivis?
Baldivis is in the City of Rockingham, east of the Kwinana Freeway’s southern section, and has been a major location for new residential estates for many years. Movehomes, using REIWA data, listed 371 vacant-land sales in Baldivis in 2024. ABS data analysed by OpenLot recorded 716 new houses in Baldivis–North in 2025–26.
A further growth area is planned under the North East Baldivis District Structure Plan. The WA Government describes that plan as covering about 760 hectares, 34 km south of the Perth CBD, adjacent to the Kwinana Freeway and Mundijong Road, and anticipated to provide up to 6,000 dwellings. An engineering report supporting the plan describes development over about 15 to 25 years. Homes in that precinct will reach handover only as stages are released.
Much of the current handover work is in later stages of existing Baldivis estates, where some streets are finished and others are still being built.
Baldivis remains one of the southern corridor suburbs with continuing land sales and new houses reaching handover. District structure planning for parts of north-east Baldivis describes a long further build-out, but a practical completion inspection is arranged for a specific completed house and lot, not for the planning area as a whole.
Sources: Movehomes (REIWA data, 2024); OpenLot, 2026 National ABS Housing Data Report; WA Government, North East Baldivis District Structure Plan (updated 18 May 2026). Postcode 6171: Australia Post. Information is general, was current when this page was written, and may change.
What gets checked at a Baldivis handover?
Sandy, filled lots
Baldivis lots are commonly sand-filled. Look for paving falls, settled soakwell covers, water pooling against the slab, and the condition of retaining and fencing.
Plans and compact lots
If you supply the approved plans or an LDP, visible differences in setbacks, garage position and fencing can be recorded. Boundary walls, eaves and gutters are checked on narrower lots.
Unfinished stages
Verge, crossover and park works may be incomplete. The report records access limitations and items outside the lot, which often sit with the developer or the City of Rockingham.
The house itself
Roof plumbing, wet areas, doors, windows and internal finishes are inspected and photographed.
How does a Baldivis handover inspection differ from a pre-purchase check?
In Baldivis the inspection follows the NCC edition on the building permit and referenced Australian Standards such as AS 2870, AS 3740 for wet areas where they can be seen, and AS 3500.3 for visible stormwater drainage. It is not an AS 4349.1 pre-purchase inspection. Because stages can be at different points of completion, unfinished adjoining streets may affect access; those limits are recorded. The report does not certify concealed work or decide contractual practical completion.
The standard your building must meet
Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.
The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).
The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.
Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.
The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.
Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.
The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.
This is a summary of legislation only and is not legal advice.
Baldivis practical completion inspection questions
The fee for a Baldivis visit is set for that property once the scope is agreed. Book online, or call 0448 028 979.
Do you inspect new homes across Baldivis estates?
Yes. Provide the address and the builder’s name. The written scope is agreed for each Baldivis home, in any current release.
Is Baldivis in the service area?
Yes. Baldivis is in the City of Rockingham and is part of the southern area we attend. A visit date is confirmed for each property.
The stage next door is still being built. Does that matter?
The inspection is of your house and lot. Unfinished adjoining streets or parks may affect access, which is noted. Public works are generally the developer’s or the City’s responsibility.
Is this the right inspection for an existing Baldivis house?
No. Use a pre-purchase building inspection under AS 4349.1 for an existing home.
How do I book a Baldivis inspection?
Request a quote or book online. Scope and fee are agreed in writing first.
Tell us what you need.
Share the Baldivis address, the builder and the handover date. Scope, fee and a time are confirmed first. Call 0448 028 979.