Registered Building Practitioner · Perth WACall 0448 028 979[email protected]
Before handover · Two Rocks

Practical completion inspections
Two Rocks, WA.

Practical completion inspections for new homes in Two Rocks, WA, at the northern end of the Perth metropolitan area. The visible work is checked against the NCC and relevant Australian Standards, with extra attention to coastal exposure and, where it applies, bushfire construction items.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Two Rocks, Western Australia
Direct answer

How does a handover inspection work in Two Rocks?

A practical completion inspection in Two Rocks is a focused check of a new home just before handover, including coastal lots and homes next to bushland. Visible work in safely accessible areas is checked against the NCC, relevant Australian Standards and acceptable workmanship standards. The report is for you to discuss with your builder.

Visible work, written up.

What does the Two Rocks practical completion visit include?

A practical completion inspection in Two Rocks is a focused check of a new home near handover. Safely accessible, visible work is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. For lots next to bushland, the inspection also looks for the visible construction items shown on the approved plans for the lot’s bushfire attack level.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Two Rocks, Western Australia
A new home near handover, in a coastal estate in the northern corridor.

Two Rocks is a City of Wanneroo suburb, postcode 6037. Include the address, the builder’s name and contact, the expected handover, how we can get on site, and any drawings or issues already noted.

What gets checked in a Two Rocks new home

  • Coastal durability: roof and wall fixings, flashings, aluminium frames, garage doors and external metalwork.
  • Bushfire construction items shown on the approved plans, where the lot has a bushfire attack level (BAL).
  • Driveways, crossovers, retaining and fencing on larger or sloping lots.
  • Internal finishes, wet areas, doors and fittings, with photographs and access notes.

Independence and what is excluded

The report does not decide practical completion under the contract, issue occupancy approval, or certify concealed construction. Specialist testing and service commissioning stay outside the visit unless they are expressly included.

We do not provide legal advice.

Housing and construction

New homes in Two Rocks.

Two Rocks is the northernmost suburb of the Perth metropolitan area, and sits in the City of Wanneroo beside the Two Rocks marina. The City’s Two Rocks Local Structure Plan covers about 423 hectares of land held by the Capricorn Village Joint Venture, which is developing the Atlantis Beach estate. The plan allows densities from R5–R20 in sensitive coastal areas to R40–R80 near the Two Rocks Marina Village.

The Two Rocks Town Centre structure plan covers land east of the marina, including the former Atlantis Marine Park site, and both plans sit within the wider Yanchep–Two Rocks District Structure Plan. The local structure plan also refers to dwellings facing Bush Forever Site 397, so some lots meet bushland.

Movehomes, using REIWA data, listed Two Rocks as a new entrant among Perth’s top suburbs by vacant-land sales in 2024, with 122 sales. New homes there range from lots near the marina to larger blocks further out, so access, travel and site conditions are confirmed for each property.

Sources: City of Wanneroo, Two Rocks Local Structure Plan (October 2017) and Two Rocks Town Centre ASP No. 70; City of Wanneroo, Yanchep–Two Rocks District Structure Plan (ASP 43); ACCC register entry for the Capricorn Village Joint Venture; Movehomes (REIWA data). Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at a Two Rocks handover.

Salt, wind and sand

Two Rocks has an exposed coastal setting. The finish and fixing of metal roofing, flashings, gutters, window frames and garage doors are looked at for early corrosion, loose fixings and unsealed gaps. Sand and moisture in door and window tracks is checked at the same time.

Lots next to bushland

If your lot has a bushfire attack level, the building permit drawings show the construction items that go with it, such as sealed gaps, ember screens on openings and the specified roof and wall materials. The inspection compares the visible items with those drawings if you supply them. Setting the BAL itself is a separate assessment and is not part of the inspection.

Larger lots and outside works

Longer driveways, crossovers, retaining walls and alfresco areas add items beyond the house. Visible concrete, paving falls and edges, retaining wall condition and fencing are recorded, along with any gaps between what was shown on the plans and what was built.

Roof space and insulation

Where the roof space can be accessed safely, ceiling insulation, sarking, fan ducts and roof plumbing penetrations are looked at. NCC 2022 energy efficiency and condensation provisions have been mandatory in WA since 1 May 2025.

Standards and method

What standard is a Two Rocks handover inspection measured against?

A practical completion inspection is not a pre-purchase inspection under AS 4349.1. It is measured against the NCC edition that applied to the building permit and the Australian Standards it references, such as AS 2870, AS 3740, AS 3660.1 and AS 1684, and, where it applies to the lot, AS 3959 for construction in bushfire-prone areas. Only visible work is checked and concealed work is not certified.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Before you enquire

Two Rocks inspection questions

Pricing is individual for each Two Rocks home and the agreed scope. Use Book online or call 0448 028 979 for a quote.

Does my Two Rocks home have a BAL rating?

It depends on the lot and its distance from bushland. The rating is set through a bushfire attack level assessment and is shown in the building permit documents. You can check whether a lot is in a designated bushfire-prone area on the State’s Map of Bush Fire Prone Areas.

What does the inspection check for bushfire construction?

Where the approved plans specify bushfire construction items, the visible items on the finished home are compared with them. The inspection does not assess the BAL and does not test materials.

Is Two Rocks within your service area?

Yes. Two Rocks is in the northern corridor we attend. Travel and availability are confirmed with the access contact and the handover date.

Do you inspect homes at Atlantis Beach?

Enquire with the address and the builder’s name. The same scope applies to a home in any Two Rocks estate: visible work in safely accessible areas, within an agreed written scope.

Can the inspection be done after I have moved in?

A practical completion inspection is intended to be done before handover. If you have already moved in, a defect inspection can be discussed, and any time limits in your contract or under WA law are for your solicitor to advise on.

How is a Two Rocks inspection booked?

Start with a quote request or the online form. The inspection is held only after written agreement on scope and fee.

Two Rocks & Western Australia

Tell us what you need.

Give us the Two Rocks address, the builder and the handover date. Scope and fee are settled before the appointment. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›