Registered Building Practitioner · Perth WACall 0448 028 979[email protected]
Before handover · Alkimos

Practical completion inspections
Alkimos, WA.

Practical completion and handover inspections for new homes in Alkimos, WA, from coastal houses to townhouses near the station. The visible work is checked against the NCC and relevant Australian Standards before handover, so findings can be raised with your builder.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Alkimos, Western Australia
Direct answer

What does a practical completion inspection involve in Alkimos?

A practical completion inspection in Alkimos is a focused check of a new home just before handover, from coastal houses to townhouses near Alkimos Station. Visible work in safely accessible areas is checked against the NCC, relevant Australian Standards and acceptable workmanship standards. The report is for you to discuss with your builder.

A defined scope for a new coastal home.

What is reviewed at practical completion in Alkimos?

A practical completion inspection in Alkimos looks at a newly built home close to handover. Safely accessible, visible work is checked against the NCC, the relevant Australian Standards and acceptable workmanship standards, and the report records incomplete or defective items within the agreed scope. It is written for you to give to your builder before you accept the home.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Alkimos, Western Australia
A newly built home ready for handover in a Perth coastal estate.

Alkimos is in the City of Wanneroo, postcode 6038. To prepare a quote, send the lot or street address, the builder’s contact details, the planned handover, access instructions, and any plans or outstanding items.

Items typically reviewed during an Alkimos handover visit

  • Coastal exposure: fixings, flashings, window and door hardware, garage doors and external metalwork.
  • Attached and smaller-lot homes: shared and boundary walls, eaves and gutters near boundaries, bin and service areas.
  • Internal finishes, doors, cabinetry and wet areas, photographed room by room.
  • Open or incomplete items on the day, recorded with access limitations.

What this visit does not decide

This visit does not decide whether contractual practical completion has occurred, grant occupancy approval, or certify work that cannot be seen. Commissioning of services and any specialist tests are left out unless they are written into the agreed scope.

We do not provide legal advice.

Housing and construction

New homes in Alkimos.

Alkimos is in the City of Wanneroo, on the METRONET Yanchep line. Alkimos Station opened for services on 15 July 2024 and has a bus interchange opposite the station entrance. DevelopmentWA describes Alkimos Central, next to the station, as a 200 hectare centre between Marmion Avenue and the Mitchell Freeway, about 40 km north of Perth, planned as one of the first transit-oriented developments in the northern suburbs.

Alkimos Central will be built over 20 to 30 years. DevelopmentWA’s timeline lists the retail precinct’s first stage opening in 2027, the City of Wanneroo’s Alkimos Aquatic and Recreation Centre opening in December 2026, and residential lots expected in the following years, with the note that timeframes are subject to change. DevelopmentWA also lists Alkimos Foreshore as an ocean-front village project.

Movehomes, using REIWA data, reported 125 vacant-land sales in Alkimos in 2024. For a buyer, the practical point is that Alkimos has both established coastal estates and newer, denser homes close to the station, and the two present different handover checks.

Sources: DevelopmentWA, Alkimos Central FAQs and development timeline; DevelopmentWA residential projects; Movehomes, Top 10 Perth suburbs by land sales 2024 (REIWA data). Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at an Alkimos handover.

Salt air and wind-blown sand

Homes near the coast see more corrosion and sand than homes inland. On handover day, look at the finish on garage door tracks, screws and fixings, aluminium window frames, gutters and roof flashings, and at whether weep holes and door tracks are clear. These items are visible within a few minutes, and they are easier to have corrected before you move in.

Attached homes and shared walls

Where homes share a wall or sit close to a boundary, the inspection checks that the visible construction matches the approved plans: wall lining and finish, eaves and gutter details at the boundary, and the junction between the roof and the shared wall. The WA appendix to the NCC Housing Provisions has variations covering fire separation of roofed outdoor areas, which matter for alfresco areas close to a neighbour.

Small lots and services

Smaller lots leave little room for error with bin pads, air-conditioning units, hot water systems and driveway gradients. The report notes whether these are installed as shown on the plans and whether they are accessible for maintenance.

Wet areas and finishes

Showers, baths, laundries and tiled areas are checked for visible workmanship, falls to wastes, grout and silicone, and cracked or drummy tiles. Waterproofing is concealed, so the builder’s waterproofing certificate is the document to ask for.

How the work is assessed

How does an Alkimos handover inspection differ from a pre-purchase check?

A practical completion inspection is not an AS 4349.1 pre-purchase inspection. It is measured against the NCC edition that applied to the building permit and the Australian Standards it references, such as AS 3740 for waterproofing, AS 3660.1 for termite management, AS 1684 for timber framing, AS/NZS 3500.3 for stormwater drainage and AS/NZS 2589 for plasterboard finishing. Visible, accessible work is checked, and the inspection does not certify concealed work.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Questions owners often ask

Alkimos practical completion inspection questions

The fee is set for each Alkimos property once the scope is agreed. Book online or call 0448 028 979 to request a quote.

Do you inspect townhouses and attached homes in Alkimos?

Enquire with the address and a copy of the plans if you have them. Attached homes can be inspected within an agreed scope, including the visible parts of shared walls, but access to roof spaces and boundaries depends on the site and the builder’s arrangements.

Does being near the coast change the inspection?

The standards are the same, but more attention goes to corrosion-prone items and to sand and moisture around openings and fixings. If you see rust staining, loose fixings or a poor finish on metalwork at handover, it goes into the report.

How do I arrange a practical completion inspection in Alkimos?

Send a quote request or use the booking link. Access, scope and the fee are confirmed in writing before a time is set.

Is the work in Alkimos Central or the foreshore part of the inspection?

No. The inspection is of your home. Public spaces, roads and commercial buildings in Alkimos are not part of a residential practical completion inspection.

Who decides whether the house is at practical completion?

The inspection report does not decide that. Practical completion is defined by your contract and, for contracts under the Home Building Contracts Act 1991 (WA), by that Act. Speak to your solicitor about your contract. We do not provide legal advice.

Alkimos & Western Australia

Tell us what you need.

Tell us the Alkimos address, the builder, and when handover is expected. Nothing is booked until scope, fee and access are confirmed. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›