Registered Building Practitioner · Perth WACall 0448 028 979[email protected]
Before handover · Eglinton

Practical completion inspections
Eglinton, WA.

Independent practical completion inspections for new homes in Eglinton, WA. Before you collect the keys, the visible work is checked against the NCC, relevant Australian Standards and acceptable workmanship standards, and you receive a written list to take to your builder.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Eglinton, Western Australia
Direct answer

What is a practical completion inspection in Eglinton?

A practical completion inspection in Eglinton is a focused check of a new home just before handover, including houses in estates near Eglinton Station. Visible work in safely accessible areas is checked against the NCC, relevant Australian Standards and acceptable workmanship standards. The report is for you to discuss with your builder.

Your new home. A defined scope.

What does a practical completion inspection cover in Eglinton?

A practical completion inspection in Eglinton is a focused inspection of a newly built home just before handover. The visible work, in safely accessible areas, is checked against the National Construction Code, the relevant Australian Standards and acceptable workmanship standards. The written report lists what was observed so that you and your builder can agree what is finished and what is not.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Eglinton, Western Australia
A new home near handover. Eglinton has several estates building at the same time.

Eglinton, postcode 6034, is in the City of Wanneroo. When you get in touch, include the street address, who the builder is, the expected handover, how access will be arranged, and any drawings or items already raised.

What this inspection looks at in Eglinton

  • Slab edges, paving, driveways and crossovers on lots where limestone or sand has been cut and filled.
  • Retaining walls, fences and drainage between neighbouring lots in estates still under construction.
  • Roof plumbing, gutters, wet areas and finishes inside the home, with photographs.
  • Comparison with the supplied plans and specification, where you provide them and agree to that scope.

Scope and independence

The inspection does not itself determine contractual practical completion, provide an occupancy approval or certify concealed construction. Service commissioning and specialist testing are excluded unless expressly agreed.

We do not provide legal advice.

Housing and construction

New homes in Eglinton.

Eglinton is in the City of Wanneroo and has a station on the METRONET Yanchep line. The Yanchep Rail Extension, which added the Alkimos, Eglinton and Yanchep stations, officially opened on 14 July 2024, with regular services starting the next day.

In March 2026 the WA Government announced that Satterley had been selected for an exclusive working period to develop 135 hectares across two sites in Eglinton, next to the existing Allara estate. The sites are expected to deliver more than 2,100 homes, with sales expected to start in 2027 and site works subject to a development management agreement. Homes reaching handover now are being built in existing estates; the newer sites are still at the pre-sales and site works stage.

REIWA figures compiled by Movehomes list 169 vacant-land sales in Eglinton in 2024, and ABS data analysed by OpenLot recorded 1,527 new houses in the combined Alkimos–Eglinton area in 2025–26. With that volume, builders are handing over many homes in the same streets, so it is worth booking the inspection date as soon as the handover date is known.

Sources: WA Government media statements on the Yanchep Rail Extension (14 July 2024) and on new homes in Eglinton and Yanchep (25 March 2026); Movehomes, Top 10 Perth suburbs by land sales 2024 (REIWA data); OpenLot, 2026 National ABS Housing Data Report. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at an Eglinton handover.

Ground conditions show up in the finishes

The Alkimos Eglinton District Structure Plan describes the area as part of the Spearwood Dune System, where limestone is commonly found under a layer of sand. Footing design is set for each lot by the builder’s engineer to AS 2870, and an inspection does not re-engineer it. What can be checked is what is visible afterwards: cracking at slab edges and in paving, water pooling against the house, settlement near backfilled trenches, and the condition of retaining walls.

Stormwater and levels

New lots are often graded to suit the street and the neighbours. At handover, check that paving falls away from the house, that soakwells and gutters are connected and clear, and that the finished ground is below the damp-proof course. Items outside the lot boundary, such as the verge or crossover, may belong to the estate developer or the local government rather than your builder.

Roof plumbing and gutters

The WA variations to the NCC Housing Provisions include requirements for the design and installation of eaves gutters. The inspection looks at falls, joints, downpipe connections and flashings from the ground and, where safe, from a ladder.

Energy and moisture features

NCC 2022 energy efficiency and condensation provisions have been mandatory for building permits in WA since 1 May 2025. Visible items include ceiling insulation where accessible, sealed exhaust fans and glazing labels. The energy rating documents and certificates are for you to request from the builder.

Standards

How is this different from a visual pre-purchase check?

A PCI is not a pre-purchase inspection under AS 4349.1. It is checked against the NCC edition that applied to your building permit and the Australian Standards it refers to, for example AS 2870 for slabs and footings, AS 3740 for waterproofing of wet areas, AS 3660.1 for termite management, AS 3700 for masonry and AS 3958.1 for ceramic tiling, together with acceptable workmanship standards. Only the visible work is checked. Concealed construction is not certified.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Common questions

Frequently asked questions about inspections in Eglinton

Each inspection is priced individually, based on the property and the agreed scope. Book online, or call 0448 028 979 for a quote.

Can you inspect a new home in Eglinton before settlement?

Yes, an inspection can be arranged before you collect the keys, subject to the builder’s access arrangements, availability and agreement on scope. Send the address, the builder’s contact and the handover date. Reports are of the inspection.

Do limestone and sandy sites change what is checked?

They change what is worth looking at, not the standard it is checked against. On sites cut into limestone or filled with sand, the visible signs of ground movement or poor drainage around the slab, paths and retaining walls are looked at closely. Footing design and site classification are engineering matters for your builder.

The estate next door is still being built. Does that matter?

It can affect access and what is finished. Unfinished verges, crossovers, street lighting and landscaping often sit with the estate developer. The report can record what is visible, but items outside your lot may not be your builder’s responsibility. Your contract and your solicitor can tell you where that line sits.

Which NCC edition applies to my Eglinton home?

It depends on your building permit. WA adopted NCC 2022 on 1 May 2023, with energy efficiency and condensation provisions mandatory from 1 May 2025, and adopted NCC 2025 on 1 May 2026. Check the permit documents or ask your builder which edition applies.

How do I book an inspection in Eglinton?

Use the online booking link or request a quote. The visit is scheduled only after the scope and fee are agreed in writing.

Eglinton & Western Australia

Tell us what you need.

Share the property address, your builder, and your handover date. Scope, fee and availability are agreed before work begins. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›