Registered Building Practitioner · Perth WACall 0448 028 979[email protected]
Before handover · Ellenbrook

Practical completion inspections
Ellenbrook, WA.

Practical completion and handover inspections for new homes in Ellenbrook, WA, in the City of Swan. From small-lot homes in established villages to future housing north of the suburb, the visible work is checked against the NCC and Australian Standards before you accept the keys.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Ellenbrook, Western Australia
Direct answer

What is a new-home practical completion inspection in Ellenbrook?

A practical completion inspection in Ellenbrook is a focused check of a new home just before handover, including small-lot and two-storey houses in the planned community. Visible work in safely accessible areas is checked against the NCC, relevant Australian Standards and acceptable workmanship standards. The report is for you to discuss with your builder.

A written record before handover.

What areas of a new Ellenbrook house are inspected?

A practical completion inspection in Ellenbrook is carried out near the end of a new build. Visible work in safely accessible areas is checked against the National Construction Code, the relevant Australian Standards and acceptable workmanship standards. The written report records incomplete and defective items, with photographs, for discussion with your builder.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Ellenbrook, Western Australia
A new home near handover in a Perth planned community.

Ellenbrook, postcode 6069, is in the City of Swan. When you enquire, send the street address, builder contact, expected handover, access arrangements and any plans or items already raised.

What an Ellenbrook practical completion inspection usually covers

  • Boundary walls, eaves, gutters and fencing on small and narrow lots.
  • Two-storey homes: stairs, balustrades, upper floors, window openings and ceiling lining.
  • Wet areas, tiling, doors, cabinetry and paint finishes, room by room.
  • Roof, plumbing, drainage and external paving, with access limitations noted.

Scope, not a contractual decision

The inspection does not determine contractual practical completion, provide occupancy approval or certify hidden work. Commissioning and specialist tests are excluded unless the agreed scope says they are included.

We do not provide legal advice.

Housing and construction

New homes in Ellenbrook.

Ellenbrook is a planned community in the City of Swan, about 28 km north-east of the Perth CBD. It was built in stages as residential villages, each with its own theme, and today includes a range of dwelling types from apartments, townhouses and micro-lots to two-storey houses and larger lots. The METRONET Morley–Ellenbrook Line, a 21 km line with five new stations including Ellenbrook, officially opened in December 2024, with the WA Government quoting a 30-minute trip to the city.

New housing is also planned north of the suburb. The North Ellenbrook West district structure plan, approved in 2026, provides for between 5,000 and 6,500 dwellings over about 20 years, with initial development anticipated from late 2027, according to the Planning Minister. A separate North Ellenbrook (East) district structure plan prepared for Lendlease estimates around 5,500 lots. Western Power has listed North Ellenbrook among the areas where new power infrastructure is expected to start in 2027.

ABS data analysed by OpenLot recorded 63 new houses in Ellenbrook in 2025–26, a fall on the year before, so much of the new building in the suburb now is on remaining lots, small-lot infill and replacement of older stock.

Sources: WA Government, METRONET Ellenbrook Line officially open (8 December 2024); Echo News, Housing plan a boost for North Ellenbrook (28 May 2026); North Ellenbrook (East) District Structure Plan, Part Two (2022); Western Power (12 October 2026); Wikipedia, Ellenbrook, Western Australia; OpenLot ABS report. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at an Ellenbrook handover.

Small lots and boundaries

On narrow and small lots, walls, eaves and gutters can sit close to the boundary. The inspection checks that the visible work is finished, that gutters and downpipes are connected, and that boundary walls and fencing match the plans. The WA appendix to the NCC Housing Provisions has specific variations for eaves gutters and for windows installed in masonry walls, which are common items on a small-lot home.

Two-storey construction

Upper floors, stairs and balustrades are checked for visible workmanship, for movement or squeaks underfoot, and for the condition of ceiling and wall lining. Window openings above ground level, handrails and stair finishes are looked at against the NCC. The WA variations also deal with installation of upper-storey floors in some climate zones.

Stormwater on compact sites

There is less room to move water on a small lot. Check that downpipes are connected to the stormwater system or soakwells, that paving falls away from the house, and that nothing is draining onto a neighbour’s lot.

Finishes and fittings

Plasterboard joints, paint, cabinetry, doors, tapware and tiling are checked in good light, with defects photographed. Sealing around baths, showers and benchtops, and the operation of doors and windows, are recorded.

Assessment basis

How is an Ellenbrook practical completion inspection different from a buyer’s inspection?

A practical completion inspection is not an AS 4349.1 pre-purchase inspection. It is measured against the NCC edition that applied to the building permit and the Australian Standards it references, including AS 1684 for timber framing, AS 3740 for waterproofing, AS 3660.1 for termite management, AS/NZS 2589 for plasterboard finishing and AS 3958.1 for tiling, together with acceptable workmanship standards. Only visible work is checked.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Frequently asked

Questions about practical completion inspections in Ellenbrook

Each Ellenbrook inspection is quoted for that property and scope. Book online or call 0448 028 979.

Do you inspect new homes built on micro-lots in Ellenbrook?

Yes. A home on a small or narrow lot is inspected within the same scope, with particular attention to boundary walls, eaves and gutters, stormwater and access. Access around the house can be limited, and that is recorded in the report.

Will you inspect homes north of Ellenbrook when they are built?

Enquiries for new homes in the North Ellenbrook area are welcome when they reach handover. The structure plans describe a long staging period, with initial development anticipated from late 2027.

Does the inspection test the electrical, plumbing and gas systems?

No. Visible installation items are noted, such as the switchboard, hot water unit and fittings, but testing and commissioning are excluded unless specifically agreed. Certificates of compliance for those trades come from the builder.

What should I send when I enquire?

The property address, the builder’s contact for access, the planned handover date, your plans and specification if you have them, and any items already raised with the builder.

Does the inspection decide whether practical completion has been reached?

No. That is a matter for your contract and, where it applies, the Home Building Contracts Act 1991 (WA). The report records the observed condition of the visible work. We do not provide legal advice.

How do I book in Ellenbrook?

Request a quote or book through the link. Written agreement on scope and fee comes first.

Ellenbrook & Western Australia

Tell us what you need.

Share the Ellenbrook address, builder and handover date so scope, fee and a time can be agreed. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›