Before handover · Mariginiup

Practical completion inspections
Mariginiup, WA.

Practical completion inspections for new homes in Mariginiup, WA, the first part of East Wanneroo to start construction under the district structure plan. The visible work is checked against the NCC and Australian Standards before you accept handover.

Last updated 28 November 2026 (Australia/Perth).

  • Registered Building Practitioner (WA) No. 101996
  • 27 years’ industry experience, national & international
  • Fully insured: Professional Indemnity and Public Liability
AI-generated illustration for a practical completion inspection of a new home in Mariginiup, Western Australia
Direct answer

What is a practical completion inspection for a new house in Mariginiup?

A practical completion inspection in Mariginiup is a focused check of a new home just before handover, including all-electric houses in the first East Wanneroo precinct. Visible work in safely accessible areas is checked against the NCC, relevant Australian Standards and acceptable workmanship standards. The report is for you to discuss with your builder.

New homes in the first East Wanneroo precinct.

What does the inspector examine in Mariginiup?

A practical completion inspection in Mariginiup is a check of a new home close to handover. Safely accessible, visible work is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. The report records incomplete and defective items, including those on all-electric homes, so they can be raised with the builder.

Newly built home in a new Perth estate ready for a practical completion inspection before handover, Mariginiup, Western Australia
A new home near handover in an East Wanneroo estate.

Mariginiup, postcode 6078, is in the City of Wanneroo. Include the address, the builder’s contact, the expected handover, how access will work, and any plans or defect lists already shared with the builder.

What is usually inspected in a Mariginiup new home

  • Visible installation of electric hot water, cooktop, air-conditioning and switchboard items on all-electric homes.
  • Slab edges, paving, soakwells and retaining on sandy and filled lots.
  • Finished work compared with the plans and specification, where supplied.
  • Roof, gutters, wet areas and internal finishes with photographs.

Boundaries of the Mariginiup inspection

This inspection is not a decision on contractual practical completion, an occupancy approval, or a certificate of concealed work. Unless agreed in writing, commissioning of services and specialist testing are not part of the visit.

We do not provide legal advice.

Housing and construction

New homes in Mariginiup.

Mariginiup is in the City of Wanneroo and is the first area to start works under the East Wanneroo District Structure Plan. In August 2025 the WA Government said work had started on the first precinct in Mariginiup, covering 123 hectares and more than 2,000 homes. Stockland’s Grevillea estate is described by Stockland as providing around 1,700 residential lots and a 300-home over-50s land lease community, Halcyon Grevillea, with all homes all-electric.

The WA Government said the community will eventually be served by new schools, a neighbourhood shopping centre and the future Mariginiup station, and that about 180 lots were to be delivered initially. Homes reaching handover in Mariginiup are therefore among the first of a long staging program, and some streets and amenities around them will be unfinished.

A due diligence geotechnical report prepared for Stockland in January 2025 for part of the site described loose Bassendean and Spearwood sand, localised uncontrolled fill, and groundwater observed between about RL43 and RL45. It noted that the site would be a Class P site in its existing condition under AS 2870, and could be classified as Class A after earthworks and compaction. Lot classification for your home is set by your builder’s engineer from the lot’s own geotechnical report.

Sources: WA Government, Land release delivering more housing choice in northern suburbs (4 August 2025); Stockland media release (5 August 2025); Douglas Partners, Due Diligence Geotechnical Investigation, Lots 803 Coogee Road and 1673 Rousset Road, Mariginiup (16 January 2025), published by the City of Wanneroo. Information is general, was current when this page was written, and may change.

Handover checks

What gets checked at a Mariginiup handover.

All-electric homes

Gas-free homes rely on electric hot water, cooking and heating and cooling. The inspection looks at whether the units are installed as specified, mounted and supported properly, labelled at the switchboard, and free of visible damage. It does not test or commission appliances. Ask your builder for the manuals, warranties and commissioning records.

Sand, fill and soakwells

On sandy lots that have been filled and compacted, the visible performance of the earthworks shows in slab edges, paving, soakwell covers and retaining walls. Free-draining sand also means soakwells and gutters need to be connected and clear from day one.

Compare the build with the plans

Estate design guidelines and the approved plans often fix details such as colours, fencing and facade materials. The inspection notes visible differences from the plans you supply, so you can raise them early.

Unfinished surroundings

In a new precinct, roads, footpaths, street trees and neighbouring lots may still be under construction. The report records access limitations on the day, and items outside the lot are for the estate developer or the local government.

Reference documents

What is a Mariginiup practical completion inspection measured against?

A practical completion inspection is not a pre-purchase inspection under AS 4349.1. It is measured against the NCC edition that applied to your building permit and the Australian Standards it references, such as AS 2870, AS 3740, AS 3660.1, AS 1684 and AS/NZS 3500.3, together with acceptable workmanship standards. Concealed work is not certified, and the inspection does not commission services.

The standard your building must meet

Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.

The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).

The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.

Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.

The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.

Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.

The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.

This is a summary of legislation only and is not legal advice.

Questions we are asked

Mariginiup handover inspection FAQs

A Mariginiup visit is priced for that house and the scope you agree. Book online or telephone 0448 028 979 for a quote.

Do you inspect homes in the Stockland Grevillea estate?

Enquire with the address and the builder’s name. A home in any Mariginiup estate is inspected within the same scope: visible work in safely accessible areas, with the scope agreed in writing first.

Does the inspection check an all-electric home’s appliances?

Visible installation items, such as the hot water unit, cooktop, air-conditioning and switchboard, are looked at for how they are installed. Testing and commissioning are excluded unless specifically agreed.

Can you inspect a home in a land lease community?

Land lease homes have different ownership and contract arrangements. Please enquire before booking so the scope and who can authorise access are clear.

How does the sand affect the inspection?

It changes what is looked at most closely, which is drainage, paving, soakwells and retaining. The footing design and site classification belong to the builder’s engineer.

Is Mariginiup in your service area?

Yes. It is within the northern corridor we attend. Access, travel and availability are confirmed for each property.

How do I book a Mariginiup practical completion inspection?

Request a quote or follow the online booking link. The appointment is made after written agreement on scope and fee.

Mariginiup & Western Australia

Tell us what you need.

Let us know the Mariginiup address, the builder and the handover date. Scope, fee and access are confirmed first. Call 0448 028 979.

Request a quote ›
Call 0448 028 979Quote ›