Practical completion inspections
Treeby, WA.
Practical completion inspections for new homes in Treeby, WA, including houses in Lake Treeby and other estates in the City of Cockburn. The visible work is checked against the NCC, relevant Australian Standards and any local development plan you supply.
Last updated 28 November 2026 (Australia/Perth).
- Registered Building Practitioner (WA) No. 101996
- 27 years’ industry experience, national & international
- Fully insured: Professional Indemnity and Public Liability

What is a practical completion inspection for a new house in Treeby?
For new homes in Treeby, including two-storey houses in Lake Treeby and other estates, a practical completion inspection records visible work just before handover. The check follows the NCC and relevant Australian Standards, including lining and finish standards where they apply. You receive the report to discuss with the builder.
What is inspected in a Treeby new home, including two-storey houses?
A practical completion inspection in Treeby is a focused check of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. Where an estate local development plan requires a two-storey home or particular frontage details, those visible items can be compared with the documents you supply.

Treeby, postcode 6164, is in the City of Cockburn. Please pass on the street address, builder contact, intended handover date, access notes, and any plans or lists already shared with the builder.
What a Treeby practical completion visit usually looks at
- Visible compliance with the estate local development plan and design guidelines, where supplied, including two-storey requirements on specified lots.
- Drainage, paving and finished levels around lakes, parks and drainage areas.
- Upper floors, stairs and balustrades on two-storey homes, where safely accessible.
- Roof, wet areas, doors, windows and internal finishes, with photographs.
Treeby scope and independence
The visit does not determine contractual practical completion, issue occupancy approval, or certify hidden construction. Specialist testing and service commissioning are left out unless they are expressly included in the scope.
We do not provide legal advice.
What is being built in Treeby and Lake Treeby?
Treeby is in the City of Cockburn and was originally part of the Banjup locality. The City’s Treeby District Structure Plan, adopted in December 2017, covers the southern part of the suburb and notes that about 147 hectares of former quarrying land, of a 460 hectare area, was the principal focus for redevelopment.
Lake Treeby, a private estate developed by Perron Group, is described by the estate as a master-planned community of over 1,000 lots (639 in the southern section and 424 in the northern section), with completion anticipated around 2029. The estate’s published frequently asked questions state that lots around the main lake require two-storey homes. Movehomes, using REIWA data, listed 78 vacant-land sales in Treeby in 2024.
A local development plan applies across the estate and, according to the estate, the City of Cockburn requires a major opening facing a secondary street or public open space on relevant lots.
Treeby was originally part of the Banjup locality and is now a City of Cockburn suburb in postcode 6164, which it shares with Jandakot and Hammond Park. Lake Treeby, a Perron Group estate, is a large part of the current build-out, and the estate’s published frequently asked questions state that lots around the main lake require two-storey homes. A practical completion inspection is arranged for the individual Treeby address, not as a generic 6164 visit.
Sources: City of Cockburn, Treeby District Structure Plan; Lake Treeby building resources and frequently asked questions; Movehomes (REIWA data). Postcode 6164: Australia Post. Information is general, was current when this page was written, and may change.
What gets checked at a Treeby handover?
Estate design requirements
If the LDP or design guidelines require a two-storey dwelling, a particular frontage or an opening to a park or side street, the inspection can compare the visible finished work with those documents if you supply them.
Two-storey construction
Upper floors, stairs, balustrades and ceiling lining are checked for visible workmanship where they are safely accessible. The WA variations to the NCC Housing Provisions also deal with installation of upper-storey floors in some climate zones.
Drainage near the lake and parks
Finished levels, paving falls and downpipe connections are checked so water is not sitting against the house or draining uncontrolled toward open space.
The rest of the house
Roof plumbing, wet areas, doors, windows and internal finishes are recorded with photographs.
Which standards are used at a Treeby handover inspection?
Treeby inspections often involve two-storey houses, so stairs, first-floor linings, balcony membranes at visible edges, and window installation receive close attention where they are safely accessible. The reference is the NCC edition on the building permit and referenced Australian Standards such as AS/NZS 2589 for gypsum linings, AS 2047 for windows, and AS 3740 for wet areas. This is not a pre-purchase inspection under AS 4349.1. Concealed structure is not certified, and the report does not decide contractual practical completion.
The standard your building must meet
Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.
The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).
The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.
Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.
The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.
Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.
The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.
This is a summary of legislation only and is not legal advice.
Treeby practical completion inspection questions
Treeby visits are quoted for that house and the agreed scope. Book online or phone 0448 028 979.
Do you inspect homes in Lake Treeby and other Treeby estates?
Yes. Provide the address and the builder’s name. A written scope is agreed for each Treeby home, in Lake Treeby or in another release.
Our Treeby house is two-storey. Is that in the usual scope?
Yes, where stairs and first-floor rooms are safely accessible. Mention that the house is two-storey when you enquire so time on site can be allowed.
Treeby shares 6164 with Jandakot. Does that matter?
Give the Treeby street address so the correct locality is quoted. Treeby, Jandakot and Hammond Park are separate suburbs that happen to share a postcode.
Is Treeby in the service area?
Yes. Treeby is in the City of Cockburn and is part of the southern area we attend. A date is confirmed for each property.
How do I book a Treeby inspection?
Request a quote or book online. Scope and fee are agreed in writing first.
Tell us what you need.
Send the Treeby address, builder details and handover timing. We confirm scope and fee before a time is set. Call 0448 028 979.