Practical completion inspections
Aveley, WA.
Practical completion inspections for new homes in Aveley, WA, next to Ellenbrook in the City of Swan. The visible work is checked against the NCC and relevant Australian Standards before you accept handover.
Last updated 28 November 2026 (Australia/Perth).
- Registered Building Practitioner (WA) No. 101996
- 27 years’ industry experience, national & international
- Fully insured: Professional Indemnity and Public Liability

What does a handover inspection mean for a new Aveley home?
For a new home in Aveley, including houses in Stockland Vale, the handover inspection is a focused record of visible work in accessible areas. Observations are made against the NCC edition that applies to the permit and the Australian Standards it references. A report follows for discussion with the builder.
Which parts of an Aveley house are reviewed at practical completion?
A practical completion inspection in Aveley is a focused inspection of a newly built home close to handover. Visible work in safely accessible areas is checked against the National Construction Code, relevant Australian Standards and acceptable workmanship standards. You receive a written report to discuss with your builder.

Aveley, postcode 6069, is in the City of Swan. To quote, we need the address, a builder contact, the expected handover date, access arrangements, and any plans or items already raised.
What the Aveley practical completion visit usually includes
- Larger and standard residential lots, including lots with wider frontages or rural-style setbacks where they occur.
- Paving, drainage, retaining and fencing, compared with the plans where supplied.
- Roof, gutters, windows, wet areas and internal finishes, with photographs.
- Access limitations and incomplete external items recorded on the day.
Aveley scope boundaries
The inspector does not decide contractual practical completion, issue occupancy approval, or certify construction that cannot be seen. Unless the agreed scope says otherwise, commissioning and specialist tests are not done.
We do not provide legal advice.
What is being built around Aveley and Stockland Vale?
Aveley is in the City of Swan and adjoins Ellenbrook and The Vines. Stockland Vale is a residential community in Aveley. Stockland has described later releases there as including larger, rural-style lots as well as more typical residential lots, so handover checks can differ from lot to lot.
The suburb shares postcode 6069 with Ellenbrook and is part of the same north-east urban area. The METRONET Morley–Ellenbrook Line, which opened in December 2024, includes Ellenbrook Station, which also serves people living in Aveley.
New homes in Aveley may be in later stages of established estates rather than in a brand-new precinct, so some streets are finished and others are still being built.
Sources: Stockland media release on a rural-style land release at Vale, Aveley; WA Government, METRONET Ellenbrook Line officially open (8 December 2024). Postcode 6069: Australia Post. Information is general, was current when this page was written, and may change.
What gets checked at an Aveley handover?
Lot type and setbacks
Larger lots can have longer driveways, bigger outdoor areas and more fencing. Smaller lots need closer attention to boundary walls and eaves. The inspection follows the plans you supply and what is visible on site.
Drainage on mixed lot sizes
Whether the lot is compact or larger, paving should fall away from the house and stormwater should be connected. Ponding against the slab is recorded.
Windows, doors and sealing
Operation, gaps, flashings and seals are checked, along with any sand or moisture in tracks.
Services and meters
The inspection notes what is visible, such as the meter box, switchboard labelling and hot water unit. It does not test or commission services.
Which documents guide an Aveley practical completion inspection?
An Aveley practical completion inspection follows the NCC edition attached to your building permit. Western Australia adopted NCC 2022 on 1 May 2023, with energy-efficiency and condensation provisions mandatory from 1 May 2025, and NCC 2025 from 1 May 2026; the edition that applies is the one on the permit, not the edition in force on the day of the visit. Referenced Australian Standards, including AS 2870 and finish and lining standards where relevant, inform the observations. The service is not an AS 4349.1 pre-purchase inspection. Only visible work in safely accessible areas is recorded.
The standard your building must meet
Under the Building Act 2011 (WA) section 37, the person named as the builder on a building permit must ensure, on completion, that the building or incidental structure complies with each applicable building standard.
The Building Regulations 2012 (WA) regulation 31A prescribes, for the purposes of section 37, the applicable building standards as the technical construction requirements set out in the applicable edition of the Building Code (the National Construction Code).
The National Construction Code (NCC), as adopted as the Building Code, references Australian Standards.
Under the Building Act 2011 sections 19 and 29, a certificate of design compliance must contain a statement to the effect that if the building or incidental structure is completed in accordance with the plans and specifications specified in the certificate, it will comply with each applicable building standard, and the person named as the builder on a building permit must ensure that it is completed in accordance with those plans and specifications.
The Building Act 2011 does not use the term “contract drawings and specifications”. Where those documents form part of a home building work contract, the Home Building Contracts Act 1991 (WA) section 4 requires the contract to be in writing, setting out all of the terms, conditions and provisions of the contract.
Under the Building Services (Complaint Resolution and Administration) Act 2011 (WA) section 6, a building service complaint is, in general, made out of time if it is made more than 6 years after completion of the regulated building service. Section 6 also provides a 15-year limit in a stated case.
The Home Building Contracts Act 1991 section 25D provides that a complying home indemnity insurance policy allows claims to be made before the expiration of a period of 6 years from the day of practical completion, within the meaning of that term in section 11 of that Act.
This is a summary of legislation only and is not legal advice.
Aveley practical completion questions
Aveley inspections are priced for the individual property and agreed scope. Book online, or call 0448 028 979 for a quote.
Do you inspect homes in Stockland Vale?
Yes. Send the address and the builder’s name. A written scope is agreed for each Aveley home, in Stockland Vale or in another release in the suburb.
Our lot is larger than a standard estate block. Does the inspection take longer?
Time on site depends on the size of the house, the grounds and the agreed scope. Mention the lot type when you enquire so an appropriate time can be allowed.
Is Aveley in the service area?
Yes. Aveley is in the City of Swan north-east area we attend. Travel time and a visit date are confirmed for the specific property.
Which NCC edition applies to my Aveley house?
The edition on the building permit. WA adopted NCC 2022 on 1 May 2023, with energy-efficiency and condensation provisions mandatory from 1 May 2025, and NCC 2025 on 1 May 2026. Ask the builder which edition the permit records.
How is an Aveley inspection booked?
Request a quote or book online. The visit is not booked until the scope and fee are agreed in writing.
Tell us what you need.
Share the Aveley address, the builder and when handover is due. Scope and fee are settled first. Call 0448 028 979.